A commercial stairwell is the hardest paint job in most buildings. The walls are tall, the footing is a staircase, the traffic never stops, and the exit has to stay usable. The right way to do it is to treat it as an access and scheduling problem first and a paint problem second. At Sigma Painting we handle commercial painting across the Greater Toronto Area, and a stairwell is where a contractor’s planning shows most. This guide covers what property managers, condo boards, developers and office managers should expect: assessment, access equipment, products, colors, safety rules and scheduling.
TL;DR
- Most early coating failures trace back to the wrong product, poor surface preparation or ignored site conditions, so assessment comes before any paint is opened.
- Walls above stairs that run past 3 metres (10 feet) call for a professional crew with proper access equipment, not a straight ladder leaned over the steps.
- Eggshell or semi-gloss on walls and semi-gloss on trim is the standard specification for stairwells that get scuffed daily.
- Exits must stay clear and lit throughout the job, so the work is phased by flight or floor.
- Record the exact paint and color formula after the job so touch-ups match years later.
Table of Contents
- Why stairwells are different from other commercial painting
- Step 1: Assess the existing coating and the substrate
- Step 2: Prepare surfaces and prime on time
- Step 3: Plan safe access for tall walls and ceilings
- Step 4: Choose the right paint and sheen
- Step 5: Pick colors that work in a stairwell
- Step 6: Keep exits clear and lit
- Step 7: Schedule to protect occupants
- What to ask for in a stairwell quote
- Keeping the finish looking good
- Get your stairwell quoted
- FAQ
- Sources
Why stairwells are different from other commercial painting
A hallway or office is flat ground. A stairwell has a floor that changes height every few inches, walls that may rise two or three storeys, and landings where a ladder simply has no level base. Add handrails, guards, door frames, fire-rated doors and exit signs, and every surface needs different handling.
It is also a life-safety space. In a fire, the stairwell is the route people use to leave. That is why the schedule and the staging matter as much as the finish, and why a stairwell repaint is usually quoted and planned differently from a standard room.
If your building also has a high open stair hall, our guide to painting a high stairwell goes deeper into access and safety.
Step 1: Assess the existing coating and the substrate
Before anyone chooses a color, someone has to find out what is on the wall and why it is failing. The Architectural Painting Contractors of Canada (APCA) states that most premature failures come from the wrong product, improper surface preparation or ignored environmental conditions. It also points out that painting over structural or design flaws generally leads to early failure.
The same APCA document refers to the Master Painters Institute (MPI) system of five Degrees of Surface Degradation. In plain terms, a wall is rated by how deteriorated its existing coating is, and that rating determines how much preparation or priming is needed. A stairwell with light scuffing needs cleaning and a light scuff-sand. One with peeling, chalking or bare patches needs far more.
What a walk-through should cover:
- Scuffs and impact damage along stair edges, door frames and where carts and luggage hit the wall.
- Cracks and settlement at landings and corners. Cracks that keep returning point to movement, not paint.
- Moisture marks. A stain near the top of a stairwell often comes from a roof, a pipe or an exterior wall. Paint will not hold until the source is fixed, and what a ceiling water stain means and what to do explains how to read these signs before repair and repainting.
- Existing coating type. An oil-based or alkyd layer under a new water-based coat changes the priming approach. A short read on alkyd versus acrylic on commercial property helps explain why the product pairing matters.
- Damaged drywall. Dents, gouges and old fastener holes are repaired before painting. We offer drywall repair and water damage wall repair among our services, so the patching and the painting sit under one plan.
For a quick way to tell what went wrong with an earlier paint job, see our paint failure diagnosis guide.
Step 2: Prepare surfaces and prime on time
APCA guidance on maintenance repaints explains that the condition of the existing coating decides the preparation method, and that priming should follow surface preparation as soon as possible because dust and salts can contaminate a prepared surface within hours to days. In a stairwell this has a practical meaning: do not sand a whole shaft on Monday and prime on Friday. Prepare and prime in the same working window, flight by flight.
Good preparation in a stairwell typically means:
- Protecting stair treads, landings, flooring and handrails you are not painting.
- Washing walls to remove grime and hand oils, which are heaviest at shoulder height along the rail.
- Repairing and sanding patches so they do not telegraph through the finish.
- Spot priming repairs and priming bare areas.
- Cutting in at ceilings, corners and door frames before rolling the open wall.
Our services include comprehensive prep and cleanup on every project, so these steps are part of the job rather than an add-on. If you are preparing to bring in a contractor, our painting preparation checklist lists what your side should have ready.
Step 3: Plan safe access for tall walls and ceilings
This is where stairwell jobs go wrong. Benjamin Moore Canada advises hiring a professional for walls or ceilings above stairs that exceed 3 metres (10 feet), noting the safety considerations and specialty tools involved. Its list of tools includes extension-pole adapters, ladder levelers and rentable indoor scaffolding.
The common failure is a straight ladder leaned against a high wall over the steps, one foot higher than the other. The better options are:
- A ladder leveler or adjustable stair platform that gives a flat, stable base on a stepped floor.
- A scaffold tower configured for stairs for tall or wide shafts, so the painter works on a platform and does not climb up and down with paint.
- Extension poles for rolling, so the painter stays within the guard and does not stretch over it.
The federal workplace rules point the same way. The Canada Occupational Health and Safety Regulations, current to September 2026 and applying to federally regulated workplaces, require a fixed ladder, stairway or ramp where employees move between levels more than 450 mm apart. They also require warning signs, and a highly visible barricade where feasible, at a hazardous stairway end, and three-point contact on a fixed ladder. Most GTA buildings fall under Ontario’s provincial rules instead, but the principles carry over: a stairwell with an open edge needs signage and barriers.
The unglamorous point is that a scaffold plan has to be built into the quote. A contractor who prices a high stairwell as if it were a hallway has either left out the access equipment or plans to improvise.

Step 4: Choose the right paint and sheen
Stairwell walls take scuffs from bags, strollers, furniture and shoulders, and they get washed more than any other wall. Sheen and product type decide how well they handle it.
The Sherwin-Williams guide specification for institutional interiors lists, for stairwell walls, a zero-VOC interior latex, a pre-catalyzed waterbased epoxy, or a two-component waterbased epoxy, in eggshell or semi-gloss for the first two and eggshell or gloss for the third. For ceilings it suggests flat, eggshell or semi-gloss, and for trim, semi-gloss.
Here is how that translates for a building owner:
| Surface | Typical sheen | Why |
|---|---|---|
| Ceilings | Flat or eggshell | Hides roller marks and minor imperfections |
| Walls | Eggshell or semi-gloss | Wipeable and resists scuffing |
| Handrail, trim, door frames | Semi-gloss | Hard-wearing and easy to clean |
| High-impact lower walls | Waterbased epoxy | Harder film for heavy traffic |
Low-odor, low-VOC products matter in occupied buildings, since the smell travels up a stairwell like a chimney. We use premium materials on our projects, and the product choice is tied to the wall condition found in the assessment.
Step 5: Pick colors that work in a stairwell
Stairwell color is mostly a lighting question. Stairwells are often lit by a few fixtures with no daylight, and a color that looks warm on a sample card can turn gray or yellow at the bottom of a shaft. Our complimentary color consultation is built for this: sample on the actual wall, check it at the stair landing at different times, and judge it under the building’s own lighting.
A few principles that hold across commercial buildings:
- Lighter, warmer neutrals brighten a closed shaft and make a long run feel less cramped.
- A slightly deeper tone on the lower wall hides scuffs, but keep a clear contrast with the floor so steps read properly.
- Safety contrast at the stairs. Institutional guidelines treat this seriously: the University of British Columbia’s November 2025 technical guidelines require stair nosing paint to conform to the building code for the visually impaired. Check the current Ontario Building Code requirements for your building when nosings are repainted.
- Match across floors. Pick one color family for the whole stairwell so repairs and later touch-ups are consistent.
Those same UBC guidelines also require the exact paint type and color formulation to be recorded in the maintenance manual so that future work matches. It is a habit every property manager can copy: keep the color name, formula, sheen and brand on file for every common area.
Step 6: Keep exits clear and lit
A stairwell is a means of egress, and a painting crew cannot treat it as a storage room. The Ontario Fire Code requires that means of egress be maintained in good repair and free of obstructions, and that lighting for exits and access to exits be maintained. In practice that affects how the work is set up:
- Scaffolds, drop sheets, buckets and tools are kept off the clear path used for evacuation.
- Exit lights and emergency lighting stay on and uncovered, even when walls around them are masked.
- Paint and solvents are not stored in the stairwell. Ontario’s industrial regulation limits flammable-liquid storage near exits, so materials go to a designated area.
- Fresh paint areas are signed so nobody brushes against a wet wall.
Your building’s fire plan and the local fire department’s requirements govern anything specific. When a stairwell has to be closed for a period, confirm the alternate routes with the building’s fire safety plan before the date is fixed.
Step 7: Schedule to protect occupants
The usual answer for occupied buildings is to phase the work. Paint one flight, floor or section at a time so that at least one route stays open, and run the noisy or smelly steps, such as sanding and priming, when the building is quietest. Evenings, weekends and low-occupancy periods are common choices for office and condo buildings.
A workable plan for most stairwells looks like this:
- Agree the sequence. Top to bottom, so drips and dust fall onto areas not yet finished.
- Confirm the alternate route and signage with the property manager.
- Notify occupants early, with the dates, the affected stairwell and the alternate stairs.
- Allow for dry and recoat time before reopening a flight to full traffic.
- Clean daily, so the stairwell is safe to use the next morning.
We explain the main ways to shorten downtime in four levers to cut commercial repaint downtime, and the logic of staying open carries over from our retail store repainting guide. For repaint timing across the whole property, see how often Canadian offices repaint.
What to ask for in a stairwell quote
Whether you manage one building or a portfolio, a clear quote for a stairwell should spell out:
- The access method for each flight and landing.
- The preparation, repairs and priming for each surface.
- Product, sheen and number of coats for walls, ceilings and trim.
- The phasing plan and working hours.
- Cleanup and protection of floors and handrails.
- The workmanship warranty in writing.
Our estimates are free, fixed and quick, and we back our work with a written workmanship warranty. A fixed price matters on a stairwell because the access equipment is the cost most likely to be missed in a loose estimate.
Keeping the finish looking good
Even a well-applied stairwell takes abuse. The cheapest protection is a routine: look at the walls on a schedule, touch up the scuffs near doors and rails early, and clean with a mild method suited to the sheen. Our guides on protecting commercial paint and twice-yearly inspections that set commercial repaint intervals set out a maintenance rhythm that property managers can adopt.
Our view on stairwells
A stairwell shows within a year whether the job was planned or improvised. The wall paint is rarely what fails first. What fails is the access, the prep or the schedule: a ladder that could not reach the top third of the wall, a patch that was never primed, an exit that was blocked for a day.
That is why we start with the building, not the color. We look at the wall condition, decide the access method, and price the whole job as one fixed number. Prep and cleanup are part of every project we do, a color consultation is free, and our workmanship warranty is in writing. For a property manager, a board or a developer, that means the stairwell is a single, predictable item and not a recurring headache.
If the shaft is high, we would rather build the right platform than send a painter up a ladder. That is the standard we hold ourselves to across the GTA.
Enrico
Get your stairwell quoted
Sigma Painting provides commercial painting for property managers, condo boards, developers and office managers across the Greater Toronto Area, from a single stairwell to multi-floor common areas. We give free, fixed estimates and keep worksites clean.

See our commercial and interior painting services or request an estimate through sigmapainting.com.
FAQ
How much does it cost to paint a commercial stairwell?
Cost depends on the height of the shaft, the number of flights and landings, the condition of the walls, the access equipment and the products chosen. Because those factors vary so much from building to building, a site visit is the reliable way to price it. We provide free, fixed estimates.
Can you use normal paint on stairwell walls?
Stairwell walls see more scuffing and cleaning than most walls, so a durable, washable finish is the better choice. Specifications for stairwells list eggshell or semi-gloss latex, or waterbased epoxy for harder wear, with semi-gloss on trim.
What access equipment is used for a tall stairwell?
The usual solutions are ladder levelers or adjustable stair platforms, scaffold towers set up for stairs, and extension poles. Benjamin Moore Canada recommends a professional contractor for walls above stairs over 3 metres (10 feet).
Can the stairwell stay open while it is painted?
Often yes, by phasing the work so one route stays open. Exits must remain unobstructed and exit lighting maintained under the Ontario Fire Code, so the plan should be confirmed against your building’s fire safety plan.
Sources
- APCA: Painting is Hard, Let the APCA Help
- APCA: Painting Tips, February 2018
- Benjamin Moore Canada: How to Paint Walls with High Ceilings
- Canada Occupational Health and Safety Regulations, SOR/86-304
- Sherwin-Williams Guide Specification
- UBC Technical Guidelines, Section 09 00 10
- Quick Reference to Sections from the Ontario Fire Code





